AUGUST 20, 2008

Home
Up

MINUTES FROM THE AUGUST 20, 2008 AUTHORITY MEETING

The meeting of the Hamburg Municipal Authority was held this evening at the Hamburg Municipal Center with Vice-Chairman Dave Fink presiding. The meeting started at 7:00 p.m.

Members Present - David A. Fink, Roger G. Kuhns, Stephen H. Blefgen, Judy E. Romig

Members Absent - Stephen A. Smith, Stanley E. Dietrich

Also Present - Joan E. London-Tilden Township Solicitor, Ronald Tirpak-Tilden Township Engineer, Martha Bertolet-Council President (arrived 7:23 p.m.), Frederick

Sheeler (arrived 7:23 p.m.), Gregory T. Unger-SDE, Charles F. Fitzpatrick- Solicitor, Keith L. Brobst-Superintendent, Lynda G. Albright-Borough

Manager, Denise L. Clare-Secretary

A motion was made by Steve Blefgen and seconded by Roger Kuhns to accept the June minutes as corrected.

ROLL CALL: Ayes- Fink, Kuhns, Blefgen, Romig

Nayes- None

Lynda Albright reported she contacted US Bank regarding the amount paid out of the Debt Service Fund Account in June which appeared on the trustee report at the July meeting.
Per the Assistant Vice President of US Bank, the entry was to pay  the Authority’s debt service payment due on June 1, 2008. The money is moved into the bond master account from
which the bondholders are paid. The other entry for that amount is to liquidate the sweep vehicle in which the Authority’s money
was invested until payment was made. Roger Kuhns asked for a copy.

A motion was made by Roger Kuhns and seconded by Steve Blefgen to accept July’s minutes with the correction (misspelling of Sikora on page 5).

ROLL CALL: Ayes- Fink, Kuhns, Blefgen, Romig

Nayes- None

VISITORS

Joan London and Ron Tirpak were in attendance regarding Tilden Township and a request for water service for part of Pleasant Hills Mobile Home Park. A copy of an email between Charles Fitzpatrick
and Joan London was handed out. The email discusses the request and the history of the issue. Joan London asked to have herself, GSP Management and Attorney Michael Zubey on September’s agenda.
 Charles Fitzpatrick asked Ron Tirpak to explain why Tilden Township cannot use their own water. Ron Tirpak stated that it is because of the wellhead distance protection program. The Tilden Township system
cannot serve the park. DEP will make no exceptions. Charles Fitzpatrick asked how the park currently gets water. Joan London stated that it is a private well system. Greg Unger asked if there is a problem. There is no
problem but the system is not large enough to cover phase 6 & 7 of the project. Greg Unger needs to review the information and was not prepared to give an answer tonight. Dave Fink stated that the Borough comes first
. Dave Fink asked about the wells. Keith Brobst stated he could not answer but that the surface source is almost out. Ron Tirpak asked if there is a possibility of drilling elsewhere. Greg Unger stated that there was but
access may make it hard to get to the well. There are thousands of acres. Greg Unger asked if West Hamburg would be added as customers. Ron Tirpak stated that both would be off of Hill Drive. Steve Blefgen suggested
looking into drilling a well in Tilden Township. Joan London stated that both parties, according to the consent agreement have to seek a water source. Greg Unger asked if they want public water. Joan London stated that she
thought they did. The township will decide after all
the ideas are in. Greg Unger stated that the issues are 1. Is there capacity? and 2. Is the Authority willing to look for alternative sources? Greg Unger asked if there is a need for
 water in West Hamburg. Ron Tirpak stated that it won’t be as critical once the sewer is in. Greg Unger stated that it should go to the Authority before it goes to Tilden Township. The September 17 Authority meeting will start at
7:00 p.m. and the water issue will be discussed starting at 7:30 p.m.

Charles Fitzpatrick asked Ron Tirpak if the details of the sewer meeting regarding rates could be reviewed. It was suggested that Hamburg should operate the Tilden Township system like it does the Windsor Township system
 The Authority would operate it from beginning to end. The wells could be metered and billed that way. Tilden Township would not need employees to take care of the pump station and system. It was to be taken back to Tilden
Township for their input. Tilden Township is in agreement with this. Greg Unger and Charles Fitzpatrick are in agreement with it and it would create regionalization. Dave Fink stated that it is ok for the future but what about the present,
 there is no agreement. Greg Unger stated that Tilden Township would finish their sewer project and then turn it over to the Authority. The bulk meter would be eliminated. Their current customers are metered separately. Dave Fink stated
that he wants the full Authority present before anything is decided. Charles Fitzpatrick stated that no vote can be taken because Judy Romig would have to recues herself and there are not 4 people to vote.

Greg Unger stated that there is a new grant called the "h2o bill" that could fit into this program. It is a 67% grant. Regionalization would put the Authority in high priority. Charles Fitzpatrick stated that there is potential for Port Clinton to be a part of the system as well.

Dave Fink introduced Martha Bertolet who introduced Fred Sheeler. They were in attendance regarding the fountain in front of the Municipal Center. Mr. Sheeler did a history of the fountain and stated that it is 105 years old. The Rotary Club
has restored it, as it had been leaking. Fred Sheeler stated that the water keeps getting turned off. The Rotary was wondering why this keeps happening and was told to come to the Authority. Keith Brobst thinks that a trickle will add up and the Borough would be
responsible to pay for the water. A pump has been installed to recycle the water. Chemicals cannot be used because they will eat the finish off the cast iron fountain. Judy Romig stated she felt the fountain should continue to run and that there should be no charge
 for the water. However, Greg Unger felt that the water use should be metered.

A motion was made by Steve Blefgen and seconded by Judy Romig to allow the fountain to continue to run at no charge.

ROLL CALL: Ayes- Fink, Kuhns, Blefgen, Romig

Nayes- None

The Trustee Treasurer’s, Administrative Treasurer’s, Sewer B,R, & I and M & T Trustee Report reports were reviewed.

 

ACCT. # Account Name Bal.-Jun. 08 Credits Debits Bal.-Jul. 08

1576025802 Water-2001 Settlement Fund $ 0.00 $ 0.00

1576025820 Water-1995 Revenue Fund $ 0.00 $ 0.00

1576025839 Water-2001 Debt Service $ 690.53 $ 10.53 $ 701.06

1576025848 Water-2001 Debt Ser. Res. Fund $228,623.03 $ 321.92 $228,944.95

1576025857 Water-2001 B, R, & I $535,294.56 $ 753.73 ($3,895.00) $532,153.29

1576025866 Water-1995 Rebate Fund $ 0.00 $ 0.00

HAMBURG MUNICIPAL AUTHORITY

OPERATING WATER/SEWER ACCOUNT ACTIVITY

July 1, 2008 to July 31, 2008

Water Revenue Account – Balance on July 1, 2008 $ 458,749.08

Water Sales/Penalties $ 34,762.31

Cert Fees, Constable Fees, Final Fees $ 583.50

Interest $ 790.93

SALDO Fee-HASD $ 2,840.64

Miscellaneous $ 57.00

$ 39,034.38

$ 497,783.46

Less Paid Out $ (41,249.12)

Balance in Treasury – July 31, 2008 $ 456,534.34

__________________________________________________________________________________________________________

 

Wissahickon Water Account – Balance on July 1, 2008 $ 144,215.63

Fire hydrant fees/penalties $

Interest $ 250.33 $ 250.33

$ 144,465.96

 

Less Paid Out $ ( 0.00)

Balance In Treasury – July 31, 2008 $ 144,465.96

__________________________________________________________________________________________________________

Fire Hydrant Account – Balance on July 1, 2008 $ 205,498.69

Fire hydrant fees/penalties $ 1,999.90

Interest $ 352.37

$ 2,352.27

$ 207,850.96

Less Paid Out $ ( 4,483.48)

Balance In Treasury – July 31, 2008 $ 203,367.48

__________________________________________________________________________________________________________

 

Hamburg Area SD Account - Balance on July 1, 2008 $ 2,521.45

Deposit

Interest $ 4.31

$ 4.31

 

Balance in Treasury – July 31, 2008 $ 2,525.76

__________________________________________________________________________________________________________

Sewer Revenue Account – Balance on July 1, 2008 $ 276,977.85

Sewer Rentals/Penalties $ 39,601.90

WTMA Rentals/Penalties $ 27,668.29

Interest $ 502.80

Boro Use of Sewer Equipment $ 500.00

M & T Reimbursement-Req. 21 & 22 $137,726.37

Miscellaneous $ 320.57

$ 206,319.93

$ 483,297.78

Less Paid Out $ ( 66,256.41)

Less Transfer to M & T Bank $ ( 126,785.56)

Balance in Treasury – July 31, 2008 $ 276,977.85

__________________________________________________________________________________________________________

Tilden Township Account – Balance on July 1, 2008 $

Tilden Rentals/Penalties $ 33,354.54

Tilden Debt Service $132,753.37

Interest $ 57.98 $ 166,165.89

 

Less Paid Out

Less Transfer to M & T Bank- July 14, 21, 31 $ ( 132,753.37)

Balance in Treasury – July 31, 2008 $ 33,412.52

BOROUGH TREASURER

 

ACCT. # Account Name Bal.-Jun. 08 Credits Debits Bal.-Jul. 08

2002688 Sewer-2006 Settlement Fund $ 0.00 $ 0.00

2002689 Sewer-2006 Revenue Fund $426,011.38 $248,408.61 ($157,609.87) $516,810.12

2002690 Sewer-2006 B, R, & I $ 59,595.37 $ 79.34 ($ 5,863.32) $ 53,811.39

2002691 Sewer-2006 Construction Fund $ 1,080.54 $ 1.47 $ 1,082.01

2002692 Sewer-2006 Debt Service Fund $ 50,168.91 $ 19,950.24 ($ 19,883.50) $ 50,235.65

2002693 Sewer-2006 Debt Ser. Res. Fund $510,966.64 $ 679.97 $511,646.61

2002879 Sewer Note - CF $ 0.00 $ 0.00 $ 0.00

A motion was made by Steve Blefgen and seconded by Roger Kuhns to accept the Trustee Treasurer’s, Administrative Treasurer’s, Sewer B,R, & I and M & T Trustee reports as presented. Lynda Albright read some miscellaneous item about the reports.

ROLL CALL: Ayes- Fink, Kuhns, Blefgen, Romig

Nayes- None

HAMBURG MUNICIPAL AUTHORITY
ENGINEER’S REPORT
August 20, 2008

SANITARY SEWER SYSTEM

SEWAGE TREATMENT PLANT ISSUES

The operations within the new wastewater treatment plant continue well. All processes are on line. Systems Design Engineering, Inc. is working assisting the Superintendent with operational questions on an as needed basis.

WISSAHICKON WATER

It is apparent that the plant has closed. Systems Design Engineering, Inc. received a call from Berks County Development for information on sewer and water capacity as they work on potentials clients to purchase the facility and lands. (no change)BLOWER CONTROL

Systems Design Engineering, Inc. and the Plant Superintendent are progressing with the blower control project approved at the July meeting.

WATER SYSTEM

WATER PRODUCTION

The impoundment dam is several feet below the upper intake. The recent rains have been enough to maintain the level, but not enough for recovery. For this report period water production was mostly from the surface water supply and supplemented from the wells.

Systems Design Engineering, Inc. inspected the lower stream weir with Keith Brobst. It is apparent that excessive water is bypassing the weir and also flowing under or around top a point below the spillway. Excess water is being wasted to maintain low flow release due to these issues. Systems Design Engineering, Inc. will discuss repair options with costs significantly lower than previously reported.

Systems Design Engineering, Inc. is assisting Tony and Keith on maintenance with some flow control valves to the filters.

Water Filtration Plant Control Project – The installation of the new control system is substantially complete. The owner license of the software issue has been resolved with licenses presented in the Authority name. The final payment in the amount of $3,000.00 will be presented.

PROPOSED WATER LINE REPLACEMENT

The project to replace the water lines in Walnut Street and South 2nd Street is progressing. Bids were received at the March 2008 Authority meeting.

Project Contractor:

Sikora Bros. Paving Bid Amount $144,000.00

10 Apache Drive

Schickshinny, PA 18655

Contracts have been prepared and executed. Notice to proceed has been issued.

The project is substantially complete with the water lines replaced, all tie-ins complete and tested. The new water line is in service.

WELL LEVEL DATA COLLECTION

Systems Design Engineering, Inc. will present options for recording well level data.

MET-ED SUBSTATION

The land acquisition sale option has been reviewed and executed. Systems Design Engineering, Inc. is supporting Met Ed’s request for information when received.

REQUISITIONS

Requisition 303 (sewer) Systems Design Engineering, Inc. $2,654.97

Requisition 327 (water) L/B Water Service, Inc. $4,882.55

Requisition 328 (water) Hach Company $4,115.50

Requisition 329 (water) Dell Marketing L.P. $1,105.45

Requisition 330 (water) Optimum Controls Corp. $3,000.00

Greg Unger handed out bid tab sheets for the sewer repair project. The bid was broken down into 5 different locations. Greg Unger stated that 3 things can be done:

Reject all bids

Award the entire job to D’Agostino

Award Wexcon #1 and do the rest of the project next year

The bid was set up to be able to pick all or none of the items.

A motion was made by Judy Romig and seconded by Steve Blefgen to do bid items #1 through #3 and award the bid to Wexcon in the amount of $64,324.00 and also give the Intent to Award and Notice to Proceed.

ROLL CALL: Ayes- Fink, Kuhns, Blefgen, Romig

Nayes- None

Greg Unger reported on the weir issue. It was looked at and the prices to fix are lower than estimated. A quote was received for $8,060 + $780 to remove a pine tree that could fall into the reservoir. A weir plate will cost $3,120. It was decided to do the repairs.

Greg Unger handed out information on data loggers. This would be used monthly and more often during a drought. Radio reads are $2,000+ per well. Roger Kuhns asked about the batteries. Batteries included are good for 10 years. It was decided to purchase the data loggers.

Greg Unger stated reported that there is a hold up with the Met-Ed title search. There is a conflict in the deeds. 13’ is in dispute and shows both the Authority and NAPA owns it. A drawing will be brought to the next meeting and explained.

Greg Unger handed out a rates and charges proposal to be added to the Rules & Regulations. This schedule of rates will be for 2008. Greg Unger recommended increasing the service charge for a 6" meter from $117 to $150. The price for meter testing (deposit)
will be changed to $100. Water consumption (illegal use) will be $1,000 + estimated water use. The section dealing with registering plumbers to perform work will have wording added that states "work performed by others than Authority personnel". The section dealing with
The Authority Engineer charging $300 per inspection fees for water taps, will have wording added that "should the Water/Sewer supt. or his representative do the inspection of a water tap, the fee will be $50.00".

A motion was made by Roger Kuhns and seconded by Steve Blefgen to approve the 2008 rate schedule with the changes as discussed.

ROLL CALL: Ayes- Fink, Kuhns, Blefgen, Romig

Nayes- None

Greg Unger asked about the reimbursement from Shartlesville Fire Company for the leak at South 4th & 61. Charles Fitzpatrick stated that he has not heard from them. Lynda Albright stated that the Authority insurance company has been made aware of the situation.
 Everyone is waiting to hear back from Shartlesville.

SOLICITOR’S REPORT

Everything has already been covered previously during the meeting.

BOROUGH MANAGER’S REPORT

Lynda Albright stated that the meeting with EPA is scheduled for August 27 at 10:00 a.m.

The bill sent to Jackson Demolition in NY for $1,353 has not been paid. Charles Fitzpatrick stated it should be taken to the District Justice.

A letter has been received from Benjamin Rogers regarding an Eagle Scout project he would like to do. His idea is to make a marker for Windsor Furnace. He is asking for permission to do this. The Authority would like to see a plan and where the marker is to be located.

CORRESPONDENCE NOTES FOR 8/20/08 AUTHORITY MEETING

Letter from First Energy dated 7/25/08 regarding the new transmission line they are planning to build to supply a new substation.

Letter from First Sealord Surety, Inc. regarding status of work being done by Optimum Control Corp at the water filtration plant.

Copy of letter from Atty. Fitzpatrick sent to Kozloff Stoudt regarding supplying water to the Tilden Mobile Home Park.

Copy of letter from Atty. Fitzpatrick sent to Shartlesville Fire Co. regarding their potential responsibility for the recent water main break on South 4th and Route 61.

Letter from DEP. Dated 8/12/08 regarding the Waiver of Permit Requirements for the Weir replacement at the Reservoir.

Letter from Ben Rodgers (Boy Scout) regarding Eagle Project – Lynda will read the contents.

SUPERINTENDENT’S REPORT

Water/Wastewater Superintendent’s Report July 2008

Water

We have, so far, been able to continue to use our surface water source. The dam level is dropping quickly but is still viable.

We are still fine tuning the new control system and there have been a few problems where we have experienced periods of instability. Tony has been working with OCC to fine tune the system and seems to have made significant progress.

New rinse, waste, and influent valves have been installed on #1 filter and it should be back in service within a few days. There is a new rinse valve waiting to be installed on #2 filter as soon as #1 is on line.

Meters at the water plant have been calibrated and certified.

July 22 started with a dirty water complaint on South 6th Street. After flushing the main there, we received reports of no or low water pressure in the higher elevations and started searching for the cause. We found a major leak on South 4th Street near SR 61. Repairs were made
by replacing over 6’ of 8" main. There was also extensive damage to the roadway which we will be repairing shortly. Due to the loss of pressure and dirty water we issued a system wide boil water notice. This is purely precautionary and there was no reason to believe there was any contamination.

The 2nd and Walnut Streets water line replacement project is progressing nicely. The mains have been installed and tested for bacteria. Services will be connected and the old main will be capped as soon as the new main is pressure tested.

 

Wastewater

The wastewater treatment plant continues to run very well. CBOD and ammonia levels remain close to non-detectable. TSS and fecal coliform also are very low. Flows are down, averaging less than .4 MGD. This would be typical for this time of year. We are still fighting a
ph problem and are adding soda ash to remain in compliance.

                                       Respectfully Submitted

                                       Keith L. Brobst 
                                       Water/Wastewater Superintendent

Keith Brobst reported that on August 26-27 the filter plant performance evaluation will be done.

Keith Brobst stated that there was a lot of criticism regarding the recent boil water advisory. We do not have the manpower to go door to door so we use mass media. Keith Brobst handed out information on a calling service. Roger Kuhns asked if the fire company could do a special sound for something like this.

EPA has started moving out of the Met-Ed area. Charles Fitzpatrick will do a hold harmless agreement for the area they are moving to.

Keith Brobst reported that Tilden Township made the connection to the force main yesterday.

BILLS & REQUISITIONS

Judy Romig suggested installing a windmill to conserve energy. Kempton was in the paper today about the one they recently installed. They are only saving $20/month and it is a 53 year payback. Greg Unger stated that they only run 27% of the time.

Lynda Albright stated that she had another bill for consideration. It is from the Department of Transportation for the Authority’s share for relocating the utility line in the amount of $8,160.34. The Gannett/Fleming bills are being processed for reimbursement. This will be added to the list of requisitions.

Roger Kuhns asked about the job tickets. There seemed to be a lot of truck use ($783) in July, and he feels this is too much money. Lynda Albright stated that the Authority is not being charged as much as an outside contractor would charge. Keith Brobst stated that he checked prices
and the average is $38-$45/hour. Roger Kuhns stated that he felt the Authority would be better off buying a truck with the Borough and each pay 50% and not being charged at all. He stated he cannot accept the charges. Lynda Albright stated that there was a lot of patching of water ditches in July and that is why the price is higher this past month. Charles Fitzpatrick suggested coming up with a fee schedule so everyone knows the rates up front and they could be changed yearly.

A motion was made by Steve Blefgen and seconded by to pay the bills as presented.

This motion for failed for lack of a second.

A motion was made by Roger Kuhns and seconded by Steve Blefgen to pay all the bills but the Borough’s pickup truck bills.

ROLL CALL: Ayes- Fink, Kuhns, Blefgen, Romig

Nayes- None

 

HAMBURG MUNICIPAL AUTHORITY

BILLS TO BE PAID

AUGUST 20, 2008
AT & T s-final phone lease $ 2.75

AT & T w-monthly long service 96.08

Barley/Snyder w-480.93-s-752.52 1,233.45

Barley/Snyder w-567.50-s-882.50 1,450.00

DelRosario, Roy C. w-constable fees 15.50

Duffey, T.A. w-calibrate meters 1,040.00

EJB Paving & Materials w-824.36-s-130.00 954.36

Edenburg Welding Co. w-drill out valve adapter 15.00

Ehrlich Co. Inc. s-monthly pest service 43.00

Environmental Equipment s-adaptor 190.26

Excelsior Blower Systems s-wire mesh filters 300.37

Exeter Supply Co., Inc. w-butterfly valve, coupling 1,097.25

Fisher Scientific w-259.12-s-141.26 400.38

Hach Company w-reagent set 136.55

L/B Water Service Inc. w-water meters 274.85

LSR Enterprises Inc. w-repair water line 4,248.72

Liquid Motion Inc. w-130.00-s-4296.00 4,426.00

Met-Ed w-2871.79-s-6313.11 9,184.90

Mountain View Supply s-supplies 5.38

PA One Call System, Inc. w-11.48-s-11.47 22.95

PPL Gas Utilities s-utility bills 225.35

Penn Pride, Inc. w-91.43-s-331.67 423.10

Pollu-tech Inc. s-polymer CL888 2,794.00

Reider, MJ Associates w-laboratory services 690.00

Reider, MJ Associates s-laboratory services 1,040.00

SCP Science w-76.50-s-76.50 153.00

Systems Design Engineering, Inc. w-4112.23-s-2979.11 7,091.34

Verizon w-114.78-s-128.51 243.29

Zee Medical Service Company s-restock medical cabinet 20.80

TOTAL $37,818.63

Bills To Be Paid total water $ 17,154.07

total sewer $ 20,664.56

Bills Paid During The Month

total water $ 28,102.79

total sewer $300,172.37

 

Grand Total For Approval

total water $ 45,256.86

total sewer $320,836.93

$366,093.79

PREPAID INVOICE LIST

 

HMA-Sewer Transfer s-sewer transfer $106,576.10

HMA-Sewer Transfer s-sewer transfer 132,753.37

HMA-Sewer Transfer s-sewer transfer 8,686.83

Clare, David A. w-meter reader 182.65

Miller, Ann M. w-meter reader 164.45

Saltzman, Debbie w-meter reader 192.40

HMA-Sewer Transfer s-sewer transfer 11,522.63

HMA w-cut weeds around dam 200.00

Borough of Hamburg w-27220.47-s-40495.47 67,715.94

Petty Cash w-supplies 4.85

Postmaster of Hamburg w-137.97-s-137.97 275.94

 

TOTAL $328,275.16

Requisition 303 Sewer B,R, & I

Systems Design Engineering, Inc. $2,654.97

 

Requisition 327 Water B,R, & I

L/B Water Service, Inc. $4,882.55

Water Meters

Requisition 328 Water B,R, & I

Hach Company $4,115.50

Composite Sampler & Controller

Requisition 329 Water B,R, & I

Dell Marketing L.P. $1,105.45

Computer

Requisition 330 Water B,R, & I

Optimum Controls Corp. $3,000.00

Application #2-Final

Requisition 331 Water B,R, & I

Systems Design Engineering, Inc. $1,271.16

Waterline Replacement

Requisition 332 Water B,R, & I

PennDOT $8,160.34

I-78 Water Line Replacement

A motion was made by Judy Romig and seconded by Roger Kuhns to pay the requisitions as presented.

ROLL CALL: Ayes- Fink, Kuhns, Blefgen, Romig

Nayes- None

Lynda Albright had a requisition to M & T Bank for reimbursement of sewer funds.

Requisition #23 July 2008 $ 56,285.06

A motion was made by Steve Blefgen and seconded by Judy Romig to pay the requisition as presented.

ROLL CALL: Ayes- Fink, Kuhns, Blefgen, Romig

Nayes- None

NEW BUSINESS

None

OLD BUSINESS

None

There being no further business, a motion was made by Steve Blefgen to adjourn the meeting at 10:00 p.m.

Attest:

Denise L. Clare, Recording Secretary