JAN. 17, 2007

Home
Up

MINUTES OF THE JANUARY 17, 2007 MEETING OF THE AUTHORITY

The meeting of the Hamburg Municipal Authority was held this evening at the Hamburg Municipal Center with Chairman Steve Smith presiding. The meeting started at 7:00 p.m.

Members Present - Stephen A. Smith, David A. Fink, Stanley E. Dietrich, Roger G. Kuhns Stephen H. Blefgen

Members Absent - Judy E. Romig

Also Present - Gregory T. Unger-SDE, Charles F. Fitzpatrick-Solicitor, Keith L. Brobst-Superintendent, Lynda G. Albright-Borough Manager, Denise L. Clare-

Secretary

At this time, the meeting was turned over to Solicitor Fitzpatrick for the purpose of reorganization.

A motion was made by Stan Dietrich and seconded by Dave Fink to nominate Steve Smith for chairman.

Nominations closed.

A motion was made by Stan Dietrich and seconded by Roger Kuhns to nominate Dave Fink for vice-chairman.

Nominations closed.

A motion was made by Stan Dietrich and seconded by Steve Smith to nominate Roger Kuhns secretary.

Nominations closed.

A motion was made by Steve Smith and seconded by Dave Fink to nominate Stan Dietrich treasurer.

Nominations closed.

A motion was made by Dave Fink and seconded by Steve Blefgen to nominate officers by acclamation.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

At this time, the meeting was turned over to Chairman Steve Smith.

A motion was made by Dave Fink and seconded by Stan Dietrich to nominate Steve Blefgen assistant treasurer.

A motion was made by Stan Dietrich and seconded by Roger Kuhns to nominate Judy Romig assistant secretary.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

Roll call was by acclamation.

A motion was made by Stan Dietrich and seconded by Steve Blefgen to nominate Barley/Snyder with Charles F. Fitzpatrick attending meetings as solicitor.

A motion was made by Stan Dietrich and seconded by Dave Fink to appoint Systems Design Engineering, Inc. as the Authority engineer for 2007 with Greg Unger attending the meetings.

A motion was made by Stan Dietrich and seconded by Roger Kuhns to appoint Gorman & Associates auditor.

A motion was made by Stan Dietrich and seconded by Steve Blefgen to nominate Denise L. Clare recording secretary for the Authority.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

Roll call was by acclamation.

A motion was made by Stan Dietrich and seconded by Steve Blefgen to approve the December minutes as presented.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

VISITORS

None

The Trustee Treasurer’s, Administrative Treasurer’s and Sewer B,R, & I reports were reviewed.

ACCT. # Account Name Bal.-Nov. 06 Credits Debits Bal.-Dec-06

1576025802 Water-1995 Settlement Fund $ 0.00 $ 0.00

1576025820 Water-1995 Revenue Fund $ 0.00 $ 0.00

1576025839 Water-1995 Debt Service $112,972.71 $ 351.95 ($35,467.50) $ 77,857.16

1576025848 Water-1995 Debt Ser. Res. Fund $243,995.63 $ 936.99 $244,932.62

1576025857 Water-1995 B, R, & I $659,675.51 $2,592.87 ($4,538.19) $657,730.19

1576025866 Water-1995 Rebate Fund $ 0.00 $ 0.00

HAMBURG MUNICIPAL AUTHORITY

OPERATING WATER/SEWER ACCOUNT ACTIVITY

December 1, 2006 to December 31, 2006

Water Revenue Account – Balance on December 1, 2006 $ 309,523.81

Water Sales/Penalties $ 46,396.78

Water Tap-In Fee $ 30,000.00

Cert Fees, Constable Fees, Final Fees $ 2,261.42

Interest $ 1,500.60

Miscellaneous $ 129.75

$ 80,288.55

$ 389,812.36

Less Paid Out $ (35,995.74)

Balance in Treasury – December 31, 2006 $ 353,816.62

_________________________________________________________________________________________________________

Wissahickon Water Account – Balance on December 1, 2006 $ 2,026.05

Water Sales/Penalties $ 17,653.30

Interest $ 83.93

$ 17,737.23

$ 19,763.28

Less Paid Out $ ( 0.00)

Balance In Treasury – December 31, 2006 $ 19,763.28

__________________________________________________________________________________________________________

Fire Hydrant Account – Balance on December 1, 2006 $ 169,103.33

Fire Hydrant Fees/Penalties $ 2,197.16

Interest $ 729.90

$ 2,927.06

$ 172,030.39

Less Paid Out $ ( 0.00)

Balance In Treasury – December 31, 2006 $ 172,030.39

__________________________________________________________________________________________________________

Sewer Revenue Account – Balance on December 1, 2006 $ 449,675.74

Sewer Rentals/Penalties $ 66,411.84

WTMA Rentals/Penalties $ 1,394.33

Sewer Tap-In Fee $ 30,000.00

Interest $ 1,607.67

Miscellaneous $ 3,337.17

M & T Bank Reimbursement $ 34,700.59

$ 137,451.60

$ 587,127.34

Less Paid Out $ (63,734.63)

Less Transfer to M & T Bank $ (144,352.95)

Balance in Treasury – December 31, 2006 $ 379,039.76

BOROUGH TREASURER

SEWER BR & I ACCOUNT

AUTHORITY MEETING JANUARY 17, 2007

 

CHECKING ACCOUNT - BALANCE IN CHECKING 12/1/06 $ 192,952.14

INTEREST $ 540.80

TOTAL RECEIPTS FOR THE MONTH OF NOVEMBER $ 193,492.94

LESS PAID OUT $ (0.00)

 

BALANCE IN CHECKING 12/31/06 $ 193,492.94

 

Dave Fink asked about the miscellaneous income.

A motion was made by Dave Fink and seconded by Stan Dietrich to accept the Trustee Treasurer’s, Administrative Treasurer’s and Sewer B,R, & I reports as presented.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

HAMBURG MUNICIPAL AUTHORITY
ENGINEER'S REPORT
January 17, 2007

SANITARY SEWER SYSTEM

SEWAGE TREATMENT PLANT ISSUES

The wastewater treatment plant has operated better in the month of December. Systems Design Engineering, Inc., Keith Brobst and plant staff continues to watch the plant carefully to determine corrective action for the difficulties encountered in the past.

Systems Design Engineering, Inc. is also working with the Solicitor on the EPA issues.

Systems Design Engineering, Inc. is gathering the data for the 2006 Winter report for the Corrective Action Plan. Contact with DEP indicates that with the completion of work to date on the collection system, wastewater plant and pump station, we may ask for a termination of the plan and connection moratorium.

A bid document for repairs of the collection system is progressing.

WWTP PROJECT

Bids were received for the Wastewater Treatment Plant on February 17, 2005. The Authority at their February 22, 2006 meeting issued the "Intent to Award" to:

General/Mechanical Contract DESCCO Design & Construction, Inc.

Amount of Contract: $5,866,184.00

Change Order No. 1 $ 7,412.00

$5,873,569.00

Electrical Contract J.B. Electric Corp.

Amount of Contract: $983,469.00

Change Order No. 1 $ 2,791.00

$986,260.00

HVAC Contract PSI Pumping Solutions

Amount of Contract: $70,900.00

Contracts were executed and the "Notice to Proceed" was issued on March 17, 2006 to all contractors. The pre-construction meeting was held on March 16, 2006. Work is progressing very well. The Contractor is maintaining the work site in a clean and safe condition.

Work completed this period:

Oxidation Ditch precast completed and tested, mechanical equipment installed. Handrails being installed.

Clarifiers tested and approved. Weirs and mechanical equipment are complete.

Pump building and electrical room nearly complete.

Distribution box concrete complete with yard piping and stop gates.

Mechanical yard piping progressing. Complete route from pump station to the clarifiers is complete. Chlorine Contact and effluent in progress.

Electrical Contractor working on conduit system, generator and switchgear installed. Motor Control Center installed and wiring of equipment progresses.

Backfilling around the clarifiers complete to rough grade.

The tie over into the new clarifiers was completed on Tuesday, January 9, 2007. The new clarifiers are now being used. The oxidation ditch is scheduled to be started on Monday, January 15, 2007. DEP inspected the facilities prior to start-up on Tuesday, January 2, 2007.

Applications for payment

DESCCO Design and Construction Application No. 10 (Requisition 241)

Amount $ 129,125.00

Balance on Contract $1,731,189.00

J. B. Electric Corp. Application No. 7 (Requisition 242)

Amount $103,516.45

Balance on Contract $358,223.55

Systems Design Engineering, Inc. has submitted payment applications for the complete grant amount and the first draw for the loan to provide continued cash flow for the remainder of the project. The first draw on the loan of approximately $2.5 million was received. The full grant amount from PennWorks was received in the amount of $687,250.00. The Authority has received confirmation of the DCED allocation of the Berks County grant in the amount of $130,000 per year for 10 years ($1,300,000 total). The second draw on the PennWorks loan is being worked on.

PUMP STATION PROJECT

Bids were received for the Pine Street Pump Station on December 16, 2005. The Authority has issued the "Intent to Award" to:

General/Mechanical Contract Pikeland Construction, Inc.

Amount of Contract: $585,000.00

Change Orders $ 5,200.00

$590,200.00

Electrical Contract Pagoda Electrical, Inc.

Amount of Contract: $206,000.00

Change Orders $ 4,520.80

$210,520.80

 

The Award and Notice to Proceed will be issued thereafter on January 20, 2006.

Work for this period included:

The project is substantially compete. Punch list items are being completed. Project closeout is in progress.

The first air release port was added to the pumps. It initially appears to work and the staff is evaluating this improvement.

Applications for payment

Pikeland Construction, Inc.

Amount $ 0.00

Balance on Contract $66,465.00

Pagoda Electrical

Amount $ 0.00

Balance on Contract $11,733.93

CORRECTIVE ACTION PLAN and I/I WORK

Systems Design Engineering, Inc. is proceeding with review of repairs of the collection system as determined by the past televising contract. Closeout documentation for the Corrective Action Plan is progressing.

WISSAHICKON WATER (no change)

Wissahickon started production. Systems Design Engineering, Inc. and Keith inspected the facility and have instructed Wissahickon on procedures and some operational details.

PROJECTS

Bids for the force main upgrade of the Edenburg Pump Station was received September 6, 2006. Intent to award, Award and Notice to Proceed was given at the September 6, 2006 meeting. Contracts have been executed.

The force main installation is complete with exception of the repaving. The final tie-in was completed on December 26, 2006. The pressure on the force main decreased as planned which increased the flow rate from the existing pumps. Pressures and amperage readings are being monitored to determine if the impellers have to be trimmed.

WATER SYSTEM

WATER PRODUCTION

The impoundment dam is full. The filter plant continues to be shut down due to difficulties with operation. All the water for this report period was produced from the wells. Bids will be received for replacement of the control system of the filter plant.

REQUISITIONS

Requisition 241 DESCCO Design and Construction $129,125.00

Requisition 242 J.B. Electric Corp. $103,516.45

Requisition 243 Systems Design Engineering, Inc. $ 22,188.13

Requisition 244 Pikeland Construction $ 36,683.30

Requisition 245 Wexcon, Inc. $ 87,922.50

Requisition 311 Systems Design Engineering, Inc. $ 274.65

Greg Unger recommended requiring M & T Bank to send summary sheets for the new sewer accounts. Hidden fees could be on there and not be known. What we have been given so far are very confusing and not easy to understand. The current balance is unknown.

Greg Unger reported that the new plant is online. There are meter issues but this could be a grounding problem.

Greg Unger handed out an updated requisition list.

Greg Unger reported that the control box replacement at the Ridge Lawn Pump Station will cost $8,200. More quotes will have to be obtained. No more than $8,200 will be spent.

Greg Unger handed out the review letter for the Villas at Hamburg. The plans are not ready for approval. Only about 50% of the issues have been addressed.

A motion was made by Steve Blefgen and seconded by Stan Dietrich to send the review letter.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

The bid for the control system was opened. OCC was the only bidder. The bid came in at $106,470, the estimate was $85,000.

A motion was made by Stan Dietrich and seconded by Roger Kuhns to give the intent to award and notice to proceed to OCC.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

SOLICITOR’S REPORT

Charles Fitzpatrick reported that EPA wants to know about the project to reduce the amount of the fine. Chip Haws recommended giving a list instead of just one idea. It has to improve water quality. The following were the ideas for the list:

Install a fence around the impounding dam.

This would be about 2,500-2,800 linear feet and 6’ high. There would be 3 strands of barbed wire and 3 gates for truck passage. This would cost approximately $45,000-$50,000.

Make improvements to the stilling well and distilling basin.

This would increase the basin for cleaning and a bypass would be installed. This would cost approximately $20,000-$30,000.

Add additional controls and SCADA to the system already in place.

Greg Unger recommended #2.

Whatever is done it has to be environmentally beneficial and not a mandated item (like I & I) . It does not have to be for the Authority, it can be for the Borough, like storm sewers. Greg Unger stated that you can’t use it for maintenance purposes. Steve Blefgen recommended taking the fence off the list. Items 2 and 3 will be submitted.

Charles Fitzpatrick spoke to Paul Ober regarding the Seaman’s at 232 Pine Street. Paul Ober has advised the Seaman’s to allow access for meter reading. Lynda Albright received another letter from the Seaman’s stating they will not allow access. The following letter was read by Lynda Albright:

Lynda Albright
Borough Manager
January 10, 2007
c/o Hamburg Municipal Authority
61 North 3rd Street
Hamburg, PA 19526                                             RE: 232 Pine Street

To Borough Manager:

Relative to your letter dated January 5, 21007, please be advised of the following:

Over the past few years you have received numerous "certified" mailings concerning this matter all of which have been "signed" for by the Borough.

You have deliberately refused to address the issue of "property owners" rights, which we fully intend to exercise.

It might be well for you to educate yourself on this issue, and realize that no Borough employees will be allowed on this property until this issue is addressed.

The Borough is the one perpetrating this merry-go-round.

Because this household is in the process of engaging an attorney for this matter, this household cannot and will not comply with your time limit request.

Sincerely yours,

/s/ Arlene R. Seaman

/s/ Evelyn Seaman

Charles Fitzpatrick recommended filing a complaint with the District Justice. At this point we can let it go and settle with the estate. A lien (current balance due) should be filed so the Authority is protected.

BOROUGH MANAGER’S REPORT

A letter was received from William and Pamela Pickel of 2657 Old Route 22 regarding a leak they had in their garage. They are looking for relief of the extra sewer.

Dear Hamburg Municipal Authority,

I am writing you this letter to ask for relief for extra sewer because of a water break that we had out in our garage. The water leaked in to the ground from a broken pipe underground from a hand water pump that we use in our garage. We wondered why our water pressure was so low until about 2 months later we discovered it leaking out in the garage. We then dug out all the stone and dirt to find the pipe that was leaking and repaired it immediately. We would certainly appreciate if you could give us relief from this water/sewer bill because of this water leak problem we had!

Thank you!

Sincerely,

Mr. & Mrs. William Pickel

A motion was made by Steve Blefgen and seconded by Dave Fink to excuse the extra sewer for the Pickel’s.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

Lynda Albright stated that there are 2 additional pieces of correspondence. One is regarding the preliminary certification of flow for sanitary sewer and the other is the final waterline certificate of flow for the Towns at Kaercher.

SUPERINTENDENT’S REPORT

Water & Wastewater Superintendent’s Report December 2006

Water

All water for the month was from the wells. We are expecting to receive bids for a new operating system for the treatment plant in mid January.

There was a service line leak on the 29th, which required a temporary shut down of the 12 inch main on Mountain Road.

Wastewater

The construction is proceeding pretty much on schedule. The new electric service has been installed to the oxidation ditch. The new clarifiers are complete and US Filter has given the OK for their use. We expect to make the tie in within the next few days.

We continue to have settling difficulties but are controlling things with chemical addition. There were mo violations to the December DMR.

The new force main from the Edenburg Pumping Station has been installed and connected. We are fine-tuning the operation, however everything seems to be working as anticipated.

Keith L. Brobst

Water& Wastewater Superintendent

BILLS & REQUISITIONS

Stan Dietrich asked about the Richard Schaeffer bill. Keith Brobst stated it was not repairs it was for modifications.

A motion was made by Dave Fink and seconded by Stan Dietrich to approve the bills as presented.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

HAMBURG MUNICIPAL AUTHORITY

BILLS TO BE PAID

JANUARY 17, 2007

AT & T w-monthly long distance $ 57.67

American Water Works Assoc. w-2 memberships 244.00

Berks Products Corp w-supplies 45.90

Borough of Hamburg w-131.78-s-230.82 362.60

Ehrlich Co. Inc. s-monthly pest service 39.00

Hamburg Municipal Authority s-utility bills 1,781.33

Henn’s Garage w-truck repair 50.00

Kuzan’s True Value w-27.67-s-164.62 192.29

L/B Water Service Inc. w-meters & parts 142.34

Liquid Motion Inc. w-120.00-s-3584.00 3,704.00

Met-Ed w-2341.47-s-7555.36 9,896.83

PA One Call System, Inc. w5.95-s-5.95 11.90

PPL Gas Utilities s-utility bills 2,389.14

Penn Pride, Inc. w-25.19-s-117.06 142.25

Reading Eagle Co. s-bid publication 202.65

Reider, MJ Associates Inc w-332.00-s-832.00 1,164.00

SCP Science w-buffers 161.00

Schaeffer, Richard M. s-repairs at RLPS 815.41

Stetzler, Roger L. w-14.00-s-60.00 74.00

Systems Design Engineering, Inc. w-3426.86-s-5129.56 8,556.42

Thren’s Auto Parts s-vehicle expense 51.36

Univar USA Inc. s-liquid chlorine & sulfur 1,355.63

Verizon w-105.78-s-231.27 337.05

Werley, Francis L. Inc. s-fuel for Edenburg PS 892.79

Zee Medical Service Company s-restock medical cabinet 16.45

TOTAL $32,686.01

Bills To Be Paid total water $ 7,434.26

total sewer $ 25,251.75

Bills Paid During The Month

total water $ 18,857.55

total sewer $173,386.99

Grand Total For Approval

total water $ 26,291.81

total sewer $198,638.74

$224,930.55

PREPAID INVOICE LIST

PPL Gas Utilities s-monthly utility bill $ 1,427.55

Captain Clog s-open lateral 178.00

Met-Ed w-487.54-s-572.65 1,060.19

M & T Bank s-transfer from sewer 144,352.95

Kuzan’s Hardware w-supplies 82.93

Clare, David A. w-meter reader 161.85

Clare, Denise L. s-meter reader 48.75

Sonon, Craig A. w-meter reader 229.45

Powerco s-filters 103.45

Borough of Hamburg w-17775.59-s-26578.70 44,354.29

Petty Cash s-petty cash 4.75

Postmaster of Hamburg w-120.19-s-120.19 240.38

TOTAL $192,244.54

Requisition #241 Sewer B,R, & I $129,125.00

DESCCO Design & Construction

WWTP Contract 1

Requisition #242 Sewer B,R, & I $103,516.45

J.B. Electric Corp.

WWTP Contract 2

Requisition #243 Sewer B,R, & I $ 22,188.13

Systems Design Engineering

WWTP Engineering

Requisition #244 Sewer B,R, & I $ 36,683.30

Pikeland Construction, Inc.

PSPS Contract A

Requisition #245 Sewer B,R, & I $ 87,922.50

Wexcon, Inc.

Edenburg PS Force Main

Requisition #311 Water B,R, & I $ 274.65

Systems Design Engineering, Inc.

Engineering Design

A motion was made by Stan Dietrich and seconded by Roger Kuhns to pay the requisitions as presented.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

A motion was made by Stan Dietrich and seconded by Steve Blefgen approved the requisition to reimburse the sewer operating fund by $54,285.79.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

NEW BUSINESS

None

OLD BUSINESS

None

There being no further business, a motion was made by Stan Dietrich and seconded by Roger Kuhns to adjourn the meeting at 8:33 p.m.

Attest:

Denise L. Clare, Recording Secretary