NOV. 15, 2007

Home
Up

MINUTES FROM THE NOVEMBER 15, 2007 MEETING OF THE AUTHORITY

The meeting of the Hamburg Municipal Authority was held this evening at the Hamburg Municipal Center with Chairman Steve Smith presiding. The meeting started at 7:08 p.m.

Members Present - Stephen A. Smith, David A. Fink, Stanley E. Dietrich, Roger G. Kuhns, Stephen H. Blefgen

Members Absent - Judy E. Romig

Also Present - Gregory T. Unger-SDE, Charles F. Fitzpatrick -Solicitor, Keith L. Brobst-Superintendent, Lynda G. Albright-Borough Manager, Denise L. Clare-

Secretary

The annual $130,000 from the county has been received.

Steve Smith announced that there would be an executive session at the end of the meeting for the members, Greg Unger and Charles Fitzpatrick.

A motion was made by Stan Dietrich and seconded by Roger Kuhns to approve the October minutes as amended. On page 241 there was a typo on Stan Dietrich’s name.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

A motion was made by Dave Fink and seconded by Roger Kuhns to approve the minutes of the November 7, 2007 special meeting as presented.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

VISITORS

None

The Trustee Treasurer’s, Administrative Treasurer’s and Sewer B,R, & I reports were reviewed.

ACCT. # Account Name Bal.-Sep. 07 Credits Debits Bal.-Oct. 07

1576025802 Water-1995 Settlement Fund $ 0.00 $ 0.00

1576025820 Water-1995 Revenue Fund $ 0.00 $ 0.00

1576025839 Water-1995 Debt Service $112,562.25 $ 71.96 ($1.00) $112,633.21

1576025848 Water-1995 Debt Ser. Res. Fund $232,470.17 $ 869.74 ($5,448.66) $227.891.25

1576025857 Water-1995 B, R, & I $563,906.10 $ 2,320.73 ($15,570.75) $550,656.08

1576025866 Water-1995 Rebate Fund $ 0.00 $ 0.00

HAMBURG MUNICIPAL AUTHORITY

OPERATING WATER/SEWER ACCOUNT ACTIVITY

October 1, 2007 to October 31, 2007

Water Revenue Account – Balance on October 1, 2007 $ 335,105.65

Water Sales/Penalties $ 44,602.27

Cert Fees, Constable Fees, Final Fees $ 405.00

Interest $ 22,066.59

Water Tap-In Fee $ 12,000.00

Miscellaneous $ 152.00

$ 79,225.86

$ 414,331.51

Less Paid Out $ (33,218.48)

Balance in Treasury – October 31, 2007 $ 381,113.03

__________________________________________________________________________________________________________

 

Wissahickon Water Account – Balance on October 1, 2007 $ 118,000.07

Fire hydrant fees/penalties $

Interest $ 359.30 $ 359.30

$ 118,359.47

Less Paid Out $ ( 0.00)

Balance In Treasury – October 31, 2007 $ 118,359.47

__________________________________________________________________________________________________________

Fire Hydrant Account – Balance on October 1, 2007 $ 196,553.14

Fire hydrant fees/penalties $ 2,350.50

Interest $ 605.60

$ 2,956.10

$ 199,509.24

Less Paid Out $ (2,596.00)

Balance In Treasury – October 31, 2007 $ 196,913.24

 

__________________________________________________________________________________________________________

Sewer Revenue Account – Balance on October 1, 2007 $ 426,300.75

Sewer Rentals/Penalties $107,247.89

WTMA Rentals/Penalties $ 29,259.77

Interest $ 1,756.33

Sewer Tap-In Fee $ 12,000.00

Miscellaneous $ 1,866.75

M & T Bank Reimbursement $ 0.00

$ 152,130.74

$ 578,431.49

Less Paid Out $ ( 45,850.57)

Less Transfer to M & T Bank $ (194,878.15)

Balance in Treasury – October 31, 2007 $ 337,702.77

BOROUGH TREASURER

SEWER BR & I ACCOUNT

AUTHORITY MEETING NOVEMBER 15, 2007

 

CHECKING ACCOUNT - BALANCE IN CHECKING 10/1/07 $ 224,290.80

INTEREST $ 582.15

TOTAL RECEIPTS FOR THE MONTH OF APRIL $ 224,872.95

LESS PAID OUT $ (0.00)

BALANCE IN CHECKING 10/31/07 $ 224,872.95

 

Stan Dietrich asked why there was a separate account for Wissahickon. Dave Fink stated that the Authority wanted it separate so it can be used for new water sources.

Stan Dietrich asked if the $175,000 is taken out of the hydrant fund would there be enough left over to get the rest of the fire hydrants painted? OTF had the ones in the business district repainted. Steve Blefgen will work on getting the rest done.

A motion was made by Stan Dietrich and seconded by to accept the Trustee Treasurer’s, Administrative Treasurer’s and Sewer B,R, & I reports as written.

Roger Kuhns asked what was paid out of the fire hydrant account. Parts for fire hydrants were purchased.

Charles Fitzpatrick asked about the sewer rental. When is the payment due? Lynda Albright stated that it is auto deducted from M & T.

The second doe the 3 reports was done by Steve Blefgen at this time.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

The organization budget reports were discussed. The Tilden Township bills were also discussed. Greg Unger will call Ron Turpak and Charles Fitzpatrick will write a letter to get the issue resolved.

ENGINEER’S REPORT
November 15, 2007

SANITARY SEWER SYSTEM

SEWAGE TREATMENT PLANT ISSUES

The operations within the new wastewater treatment plant continue well. All processes are on line. The sludge thickener has been moved and is situated in the new building. The paving and final restoration has been completed. The project will be nearly completed by the end of November including punchlist items.

Systems Design Engineering, Inc. is on hold with the bid document for repairs of the collection system while the finances of the Authority are reviewed to determine future capital expenditures.

Lynda Albright, Steve Smith and Systems Design Engineering, Inc. meet throughout this month to review the financial accounts of the Authority. Funds are being transferred to the proper accounts to close the construction project. Funds from Berks County (IFIP Grant) and Tilden Township reimbursements are needed to fully complete the project funding.

WWTP PROJECT

Bids were received for the Wastewater Treatment Plant on February 17, 2005. The Authority at their February 22, 2006 meeting issued the "Intent to Award" to:

General/Mechanical Contract DESCCO Design and Construction, Inc.

Amount of Contract: $5,866,184.00

Change Orders No. 1-3 $ 106,201.00

$5,972,385.00

 

Electrical Contract J.B. Electric Corp.

Amount of Contract: $983,469.00

Change Order No. 1-2 $ 4,137.97

$987,606.97

 

HVAC Contract PSI Pumping Solutions

Amount of Contract: $70,900.00

 

Contracts were executed and the "Notice to Proceed" was issued on March 17, 2006 to all contractors. The pre-construction meeting was held on March 16, 2006. Work is progressing very well. The Contractor is maintaining the work site in a clean and safe condition.

Work completed this period:

The Electrical Contractor has completed all their work and has started their punch list and closeout items.

Construction in the old Control Building. Finish work in the new bathrooms and painting progress with final cleanup.

Final grading and paving has been completed.

Garage building is complete and new heaters installed.

Sludge thickener building has been completed with the re-installation of the sludge thickener.

Change Order No. 3 to J.B. Electric for $682.97 is presented for approval. This change order is for moving an existing photo eye and relocation of a water heater in the garage.

Change Order No. 4 to DESCCO for $13,474.00 is presented for approval. This change order was approved to be performed by the Authority at a prior meeting for replacement of deteriorated roof decking on the garage and a change to the final paving behind the control building.

Applications for Payment

DESCCO Design and Construction Application No. 20 (Requisition 280)

Amount $145,884.00

Balance on Contract $178,316.00

J.B. Electric Corp. Application No. 15 (Requisition 281)

Amount $ 18,194.37

Balance on Contract $ 49,347.15

 

PSI Pumping Solutions

Amount $ 0.00

Balance on Contract $ 11,088.00

 

DESCCO Design and Construction Application No. 21 (Requisition 283)

Final Payment and Release of Retainage

Amount $178,316.00

Balance on Contract $ 0.00

 

J.B. Electric Corp. Application No. 16 (Requisition 284)

Final Payment and Release of Retainage

Amount $ 49,347.15

Balance on Contract $ 0.00

 

Final payment and release of retainage is proposed to be held until completion of punchlist items, receipt of closing documents, as built record drawings, release of liens and consent of surety. Both contractors have indicated that everything will be completed and received prior to December 1, 2007.

WISSAHICKON WATER (no change)

No issues this report period.

PROJECTS

Financial Review – Systems Design Engineering, Inc. reviewed the financial accounts of the Authority in preparation of the closeout audit for the wastewater expansion project required by PennWorks. A review of the all the capital budget accounts, project costs and Tilden rate schedule for forwarded to them for review. Systems Design Engineering, Inc. has not heard back from Tilden on the proposed rate. The Authority Chairman, Borough Manager and Systems Design Engineering, Inc. reviewed the Authority accounts along with the Trustee to rebalance the accounts to close the construction projects.

WATER SYSTEM

WATER PRODUCTION

The impoundment dam is down to the second inlet structure and for production purposes, empty. Water for this report period was produced entirely from the wells.

Water Filtration Plant Control Project – The installation of the new control system is substantially complete. The tie-in of the alarm system has been completed.

PROPOSED WATER LINE REPLACEMENT

Enclosed with this report are estimates to replace the water lines in Walnut Street and South 2nd Street. This project was previously discussed to replace old lines and improve the fire flow capacity in that area.

REQUISITIONS

Requisition 280 DESCCO Design and Construction $145,884.00

Requisition 281 J.B. Electric, Inc. $ 18,194.37

Requisition 282 Systems Design Engineering, Inc. $ 5,852.98

Requisition 283 DESCCO Design and Construction $178,316.00

Requisition 284 J.B. Electric, Inc. $ 49,347.15

Requisition 321 Gannett Fleming $ 4,521.98

Requisition 322 L/B Water Service $ 3,260.04

Greg Unger stated that the 2 change orders are needed to make the required work. J.B. Electric and Descco were previously discussed, the paperwork needs to be approved.

A motion was made by Steve Blefgen and seconded by Dave Fink to approve change orders #3 and #4.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

Figures to replace the water lines were discussed. The approximate costs for each are as follows: $54,000-Walnut Street

$74,000-South 2nd Street

A motion was made by Stan Dietrich and seconded by for Greg Unger to proceed with the documentation to replace the South 2nd Street and Walnut Street water lines.

Roger Kuhns asked where the repaving is on the list. Greg Unger stated that there would be trench repair.

Roger Kuhns seconded the motion at this time.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

SOLICITOR’S REPORT

Heck Subdivision-A house is being built on Lot 3. The force main (a grinder pump is required) will have to extend into our line into the street. Greg Unger thinks that they could get a gravity line to work. Charles Fitzpatrick stated that an agreement will be needed for Lot 2 for the force main.

Naugle-Their attorney got back to the Authority and stated that the Naugle’s will settle for $2,500. The Authority offered $2,165. The Authority decided to stick with the original amount offered ($2,165). Charles Fitzpatrick will inform the Naugle’s and their attorney.

Wissahickon-Charles Fitzpatrick asked if the $34,780.90 sewer bill he sent paid yet. As of October 18 they had 30 days to pay. This bill has not been paid to date. An agreement extension goes until the end of November unless the sewer bill is paid then it will go to December 31, 2007.

A motion was made by Steve Blefgen and seconded by Dave Fink to extend the agreement to December 31, 2007 conditioned upon the Authority receiving payment.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

Lynda Albright stated that it was but the check has not been cashed to date.

BOROUGH MANAGER’S REPORT

513 Island Street-Lynda Albright stated that the property is billed one service charge. There are now 3 businesses in the building. A plot plan has been submitted. The bathrooms have always been there. Should the 2 other service charges be billed? Greg Unger stated that the usage should be checked against the base year and go from there.

The correspondence list for the month was handed out.

CORRESPONDENCE LIST

CORRESPONDENCE FOR NOVEMBER 15, 2007:

Copy of letter to Albert Lear of Trident , LLC from Charles Fitzpatrick dated 10/18/07 regarding the extension of the water agreement for supplying water to Wissahickon.

Copy of letter sent to Charles Fitzpatrick, dated October 19, 2007 regarding the invoice for the waterline in Edenburg for the Naugle property..

Copy of letter to J.P. Mascaro to the Authority from SDE, dated 10/25/07 regarding the Water Generator Hazardous Waste Determination Certification and analytical reports.

Letter to the HMA, c/o Borough Manager from M & T Bank dated 11/1/07 requesting copies of the Engineer’s Certificate and Engineer’s Report.

Lynda Albright stated that M & T Bank met with Steve Smith, Greg Unger and herself. Lynda Albright now understands the reports and regular monthly reports will be done.

SUPERINTENDENT’S REPORT

Water/Wastewater Superintendent’s Report October 2007

Water

In spite of the heavy rains we’ve had recently the dam remains unusable due to low level. The wells are also showing some strain and we urge conservation.

Hydrants were flushed and the system overall looks pretty good.

We moved several curb stops on Arthur Street to accommodate the installation of new curbs.

The new control system at the water filtration plant is essentially complete except for a few punch list items. We expect these things to be resolved in the next few weeks.

Wastewater

The wastewater plant is working very well. The effluent is well within parameters although we had a slight hiccup during a period of taking tanks off line and changing flow patterns resulting in a low d.o. level.

The construction is progressing and we can see the end approaching. The paving has been completed and the fence and gate have been installed. I am happy to say the entrance from State Street at the bridge has been closed. Access is now from Front and Pine Streets. The remaining items are the remodeling, painting and finish work. There is also some demolition to be completed.

Rains mid-month created some problems at the Ridge Lawn Pumping Stations. High flows were overwhelming the wet well and we pumped it out to a tanker twice. We have been unable to find the problems on the Authority side of the traps and suspect that leaking laterals are the culprits. The plant had no problems with the flow although we had to put extra tanks on line.

                                    Respectfully Submitted

                                       Keith L. Brobst 
                                          Water/Wastewater Superintendent

Keith Brobst reported that the well levels are down significantly. Possible leak flows are up over the last 3 days.

Greg Unger recommended getting gauges for the wells. The costs would be $1,500 or less per well. Greg Unger will look into the costs further and come back with a recommendation.

Stan Dietrich asked Keith Brobst about the dry hydrant. Keith Brobst reported that the parts are in and the strainer cost $65.

BILLS & REQUISITIONS

Stan Dietrich asked what was purchased from California Contractors. Keith Brobst stated it was marking paint and gloves and that he got a good deal on them.

Stan Dietrich asked what was bought at Reading Electric. Keith Brobst stated that it is an uninterrupted power supply.

A motion was made by Roger Kuhns and seconded by Stan Dietrich to pay the invoices as presented.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

HAMBURG MUNICIPAL AUTHORITY

BILLS TO BE PAID

NOVEMBER 15, 2007

AT & T s-quarterly phone lease $ 14.55

AT & T w-monthly long distance 69.37

Barley/Snyder w-220.50-s-458.50 679.00

Berks Products Corp w-supplies 297.96

Berks-Mont Newspapers, Inc. w-hydrant flushing notice 117.36

Borough of Hamburg w-83.97-s-193.96 277.93

California Contractors Supplies w-125.00-s-118.80 243.80

DelRosario, Roy C. w-constable fees 150.00

EJB Paving & Materials w-supplies 612.92

Ehrlich Co. Inc. s-monthly pest service 41.00

Environmental Equipment & Service s-pump heads 332.08

Exeter Supply Co., Inc. w-hydrants parts 901.15

Henn’s Garage s-van inspection 50.40

Kershner, Mike s-electric gate motor 431.09

Kuzan’s True Value w-48.19-s-46.73 94.92

L/B Water Service Inc. w-47.15-s-300.00 347.15

Liquid Motion Inc. w-130.00-s-4978.00 5,108.00

Malden, W.G. Inc. s-calibrate influent meter 312.50

Met-Ed w-3175.82-s-6172.18 9,348.00

Mountain View Supply s-supplies 223.28

PA One Call System, Inc. w-27.55-s-27.55 55.10

PPL Gas Utilities s-utility bills 196.90

Penn Fuel Propane w-propane 448.09

Penn Pride, Inc. w-56.64-s-255.03 311.67

Reading Electric w-10 amp UPS 1,160.00

Reider, MJ Associates w-laboratory services 557.00

Reider, MJ Associates s-laboratory services 1,350.00

Systems Design Engineering, Inc. w-549.49-s-1387.44 1,936.93

Thren’s Auto Parts s-supplies 50.98

USA Bluebook w-hose 56.05

Univar USA Inc. w-1027.56-s-1365.00 2,392.56

Univar USA Inc. w-liquid chlorine 994.50

Verizon w-110.28-s-125.88 236.16

 

TOTAL $28,785.48

Bills To Be Paid total water $ 10,353.63

total sewer $ 18,431.85

Bills Paid During The Month

total water $ 23,293.10

total sewer $223,080.75

 

Grand Total For Approval

total water $ 33,646.73

total sewer $241,512.60

$275,159.33

PREPAID INVOICE LIST

 

HMA-Sewer Transfer s-sewer revenue transfer $ 107,929.84

HMA-Sewer Transfer s-sewer revenue transfer 67,044.64

Dollar General Store s-supplies 50.75

HMA-Sewer Transfer s-sewer revenue transfer 9,861.01

Clare, David A. w-meter reader 182.65

Miller, Ann M. w-meter reader 163.80

Sonon, Craig A. w-meter reader 191.75

HMA-Sewer Transfer s-sewer revenue transfer 10,042.66

Borough of Hamburg w-22615.57-s-28020.32 50,635.89

Petty Cash W-7.80 7.80

Postmaster of Hamburg w-131.53-s-131.53 263.06

 

TOTAL $246,373.85

Requisition #280 Sewer B,R, & I $145,884.00

DESCCO Design & Construction

WWTP-Contract 1

Requisition #281 Sewer B,R, & I $ 18,194.37

J.B. Electric, Inc.

WWTP-Contract 2

Requisition #282 Sewer B,R, & I $ 5,852.98

Systems Design Engineering, Inc.

WWTP Engineering

Requisition #283 Sewer B,R, & I $

DESCCO Design & Construction

WWTP-Contract 1

Requisition #284 Sewer B,R, & I $ J.B. Electric, Inc.

WWTP-Contract 2

Requisition #321 Water B,R, & I $ 4,521.98

Gannett Fleming

Final Payment for I-78 Project

Requisition #322 Water B,R, & I $ 3,260.04

L/B Water Service

Water Meters

Requisitions #283 and #284 will be put on hold until all work is completed since these are the final payments.

A motion was made by Stan Dietrich and seconded by to pay all the requisitions but #283 and #284 in full and approve #283 and #284 and have Greg Unger hold them until the punch list is done by year end.

This motion failed for lack of a second.

Steve Smith turned the gavel over to Dave Fink.

A motion was made by Steve Smith and seconded by Steve Blefgen to pay all the requisitions except #283 and #284.

ROLL CALL: Ayes- Smith, Fink, Dietrich, Kuhns, Blefgen

Nayes- None

Greg Unger will bring Requisition’s #283 and #284 back to next month’s meeting.

NEW BUSINESS

The budgets were discussed. An increase in rates may be needed.

OLD BUSINESS

None

There being no further business, the meeting concluded at 8:55 p.m.

At this time the members went into executive session. No action was taken.

Attest:

Denise L. Clare, Recording Secretary